Cold nights -2.7 C but that is gone back to 10 C later in the week, roof closed, tiles and all.
Some small jobs, some painting new ceiling in bathroom to be made, cleaning up to do, new kitchen installed bathroom almost done bar ceiling, toilet done just painting.
New central heating working fine, think this week all can be done what is needed so 3 weeks done.
Then new antenna's can be set up, brackets in the attick pipes through roof ( 2) and make watertight redo all antenna's including 160 meter vertical which will be done in spring.
Don't know when the mounts go up and antenna's depending temperature and weather.
I get by using some streams here....