At last this structure will only need repainting every 10 years instead of being a continuous process..........
Notice the slender road bridge in the background.
At last this structure will only need repainting every 10 years instead of being a continuous process..........
Notice the slender road bridge in the background.
One more then, the steel giant is a 4-lane road bridge over the River Mersey alongside a much older brick-pier and cast iron structure carrying 2 rail tracks. The entrance towers at either end are quite something though
![]()
Last edited by HUGH; 10-01-2010 at 02:03 PM. Reason: Elaboration
That's the Firth of Forth bridge, right? What have they done to decrease the painting frequency?
All the world’s a stage, but obviously the play is unrehearsed and everybody is ad-libbing his lines. Maybe that’s why it’s hard to tell if we’re living in a tragedy or a farce.
What's gone south with their loco, Hugh? Are they watching the points of that turn-out or is it stopped?